This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision | ||
mercator:todo [2013/12/10 09:18] krisa [Materials] |
mercator:todo [2014/10/18 23:27] (current) |
||
---|---|---|---|
Line 1: | Line 1: | ||
+ | ====== Mast ====== | ||
+ | * Cut off mast head | ||
+ | * Remove sheaves and cut off sheave winglets | ||
+ | * Weld up sheave holes | ||
+ | * Weld on new mast head | ||
+ | * Four angles for external blocks | ||
+ | * Two angles for fore/back stays | ||
+ | * Run electrical externally or internally? | ||
+ | * Remove all mast hardware and steps | ||
+ | * Epoxy putty fill all holes | ||
+ | * Or weld up holes? | ||
+ | ===== Rig ===== | ||
+ | * New tangs | ||
+ | * New fasteners, pins | ||
+ | * New tang backing plates | ||
+ | * New 316 stainless wire | ||
+ | |||
+ | ===== Electronics ===== | ||
+ | * New masthead light - 360 anchor, bi-color, stern combo | ||
+ | * New teaming light - 225 | ||
+ | * RF antenna | ||
+ | |||
+ | ====== Remove Deck Hardware ====== | ||
+ | |||
+ | * Stantions, stantion bases and pulpits | ||
+ | * Dock cleats, front/back | ||
+ | * Bronze chalks on toerail, front(sbd/ | ||
+ | * Toerail track | ||
+ | * Boom " | ||
+ | * Old engine controls | ||
+ | * Anchor base | ||
+ | * Anchor-rode standpipe? | ||
+ | * Compass | ||
+ | |||
+ | ===== New Tools ===== | ||
+ | |||
+ | * Impact wrench | ||
+ | |||
+ | ====== Re-Strengthen, | ||
+ | |||
+ | * Drill and epoxy deck hardware holes | ||
+ | * Dremel coachroof seams and epoxy | ||
+ | * Sand & epoxy toerail wood | ||
+ | * Sand & epoxy coachroof wood | ||
+ | * Sand deck | ||
+ | |||
+ | ===== Materials ===== | ||
+ | |||
+ | * West System epoxy with pumps | ||
+ | * Mixing sticks and containers | ||
+ | * Isopropyl / Acetone | ||
+ | * Sand paper for random orbital and hand sander | ||
+ | * Diesel Heater | ||
+ | * Mr. Heater - MH75KTR, Do It Best on Division $255.00 | ||
+ | |||
+ | ====== Paint ====== | ||
+ | |||
+ | * Deck (cream, Perfection Pro) | ||
+ | * Toerail (Black) | ||
+ | * Coachroof (brown? green? cream?) | ||
+ | |||
+ | ===== Materials ===== | ||
+ | |||
+ | * 2gal Perfection Pro cream | ||
+ | * 1qt Perfection Pro black | ||
+ | * Brushes, pan liners | ||
+ | |||
+ | ====== Rebed Hardware ====== | ||
+ | |||
+ | * Pulpits and stantions | ||
+ | |||
+ | ===== Materials ===== | ||
+ | |||
+ | * New Stantions? | ||
+ | * New chaulks and cleats | ||
+ | * Get cleats from Steven Roberts | ||
+ | * New bow roller? | ||
+ | * Butyl-tape | ||
+ | |||
+ | |||
+ | ====== Approved Work ====== | ||
+ | === Estimate 4511 === | ||
+ | * Haul-out, wash, block, ground sheet | ||
+ | * Leaks | ||
+ | * Center hatch | ||
+ | * new hatch | ||
+ | * Bomar P/N: N1060-10A | ||
+ | * Portlights | ||
+ | * Engine removal | ||
+ | * Inspect fuel tank for gasoline conversion | ||
+ | * Drive shaft | ||
+ | * Cut out shaft log | ||
+ | * Fill and fair both ends | ||
+ | |||
+ | ====== Pending Estimate Request ====== | ||
+ | |||
+ | === New Primary Winches === | ||
+ | * Winches will be provided, I found a pair on sale | ||
+ | * Removal of current ones | ||
+ | * keeping wood coaming mount platform | ||
+ | * remove cleats, but I want to keep them | ||
+ | * Installation of two " | ||
+ | * would like them bolted through the deck | ||
+ | |||
+ | === Chain Plates === | ||
+ | * Chain plate removal | ||
+ | * X-ray inspection for flaws, or just replace? | ||
+ | * Will all chain plates need removing, or can a select few be used as a sample base? | ||
+ | * I think headstay plate needs attention regardless | ||
+ | * Would they benefit from having a stainless backing plate on the inside on top of the current wooden one? Currently plate nuts have a backing washer pushing into a wood backing plate | ||
+ | * If the chain plates look weak, I want to replace with silicon bronze from a local source if possible. | ||
+ | * or there is always Allied Titanium if price affordibly | ||
+ | |||
+ | === Boom goose-neck === | ||
+ | * The bushing piece that connects the boom to the mast needs replacement | ||
+ | * Distance needs to be maintained in order for mainsail to keep dimensions (the tack hank) | ||
+ | |||
+ | === Mast Rebuild === | ||
+ | * Cost the same for a new mast/boom instead of all this work? | ||
+ | * bring 3 halyards internal, 1 stays external, new sheaves | ||
+ | * new standing rigging hardware, toggles, hardware, bolts, etc. | ||
+ | * assume Dynex Dux rope rigging is going to be used | ||
+ | * spreader hardware inspection/ | ||
+ | * Masthead | ||
+ | * cut top off, install one with fasteners not welded | ||
+ | * VHF antenna with cable run | ||
+ | * Airmar weatherstation PB200 with cable run | ||
+ | * LED lighting installed into masthead tri-color/ | ||
+ | * Aqua Marine steaming light installed, gutted with LED lighting | ||
+ | |||
+ | ====== Future ====== | ||
+ | |||
+ | === Outboard === | ||
+ | * Lowering and reinforcing outboard bracket | ||
+ | * Conversion of diesel fuel tank to gas | ||
+ | |||
+ | === Rudder/ | ||
+ | * Teardown of rudder/ | ||
+ | * X-ray inspection of rudder for flaws (or whatever is equivalent for inspecting rudder issues) | ||
+ | * Reassembly of rudder/ | ||
+ | |||
+ | === Standing Rigging === | ||
+ | * Work with Colligo Marine on a Dynex Dux system | ||
+ | * oversize the headstay? | ||
+ | * Can old bronze turnbuckles be heat treated and re-used? | ||
+ | * if not, new turnbuckles or go with deadeye terminators? | ||
+ | |||
+ | === Stern port/ | ||
+ | * Strong fixed points for fastening a bridle for a series drogue | ||
+ | * Should also be able to use for running backstays for future solent or inner stay. | ||
+ | |||
+ | === New toerail tracks === | ||
+ | * black, through-bolted, |