Deck

  • Strip paint
  • Strip varnish from coach-roof
  • Remove/chip-out rot, replace with closed cell foam
  • Fair and fillet deck, coach-roof
  • Fillet deck to coach-roof joints, deck to coaming joints
  • Look at owner supplied S-1 sealer. Coat deck if recommended.
  • Epoxy fill hardware fastener holes
  • Epoxy fill engine control locations (next to tiller), controls not to be re-installed
  • Two layers of FRP, sand, fair
  • Fillet coach-roof to deck joint and deck to toe-rail
  • Paint deck (cream)
  • Sand varnish, Paint over coach-roof teak (cream)
  • Sand varnish, Paint toe-rail (black)
  • Sand and re-varnish coaming around cockpit area
  • Install new self-tailing winches

Hardware Re-Install

  • All through-bolted hardware to be installed with fitted backing plates
  • Stantion bases and stantions
  • Hawse-pipe
  • Pulpits
  • Tiller arm, base and rudder
  • Do not use 3M 5200

Bottom

  • Two coats of ablative bottom paint