User Tools

Site Tools


mercator:todo

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
mercator:todo [2013/09/25 03:02]
krisa RPM self-repair
mercator:todo [2014/10/18 23:27] (current)
Line 1: Line 1:
 +====== Mast ======
 +  * Cut off mast head
 +  * Remove sheaves and cut off sheave winglets
 +  * Weld up sheave holes
 +  * Weld on new mast head
 +    * Four angles for external blocks
 +    * Two angles for fore/back stays
 +  * Run electrical externally or internally?
 +  * Remove all mast hardware and steps
 +    * Epoxy putty fill all holes
 +    * Or weld up holes?
  
 +===== Rig =====
 +  * New tangs
 +  * New fasteners, pins
 +  * New tang backing plates
 +  * New 316 stainless wire
 +
 +===== Electronics =====
 +  * New masthead light - 360 anchor, bi-color, stern combo
 +  * New teaming light - 225
 +  * RF antenna
 +
 +====== Remove Deck Hardware ======
 +
 +  * Stantions, stantion bases and pulpits
 +  * Dock cleats, front/back
 +  * Bronze chalks on toerail, front(sbd/prt)/back(sbd/prt)
 +  * Toerail track
 +  * Boom "pulpit(?)"
 +  * Old engine controls
 +  * Anchor base
 +  * Anchor-rode standpipe?
 +  * Compass
 +
 +===== New Tools =====
 +
 +  * Impact wrench
 +
 +====== Re-Strengthen, Epoxy, and Prep ======
 +
 +  * Drill and epoxy deck hardware holes
 +  * Dremel coachroof seams and epoxy
 +  * Sand & epoxy toerail wood
 +  * Sand & epoxy coachroof wood
 +  * Sand deck
 +
 +===== Materials =====
 +
 +  * West System epoxy with pumps
 +  * Mixing sticks and containers
 +  * Isopropyl / Acetone
 +  * Sand paper for random orbital and hand sander
 +  * Diesel Heater
 +    * Mr. Heater - MH75KTR, Do It Best on Division $255.00
 +
 +====== Paint ======
 +
 +  * Deck (cream, Perfection Pro)
 +  * Toerail (Black)
 +  * Coachroof (brown? green? cream?)
 +
 +===== Materials =====
 +
 +  * 2gal Perfection Pro cream
 +  * 1qt Perfection Pro black
 +  * Brushes, pan liners
 +
 +====== Rebed Hardware ======
 +
 +  * Pulpits and stantions
 +
 +===== Materials =====
 +
 +  * New Stantions?
 +  * New chaulks and cleats
 +    * Get cleats from Steven Roberts
 +  * New bow roller?
 +  * Butyl-tape
 +
 +
 +====== Approved Work ======
 +=== Estimate 4511 ===
 +  * Haul-out, wash, block, ground sheet
 +  * Leaks
 +  * Center hatch
 +    * new hatch
 +    * Bomar P/N: N1060-10A
 +  * Portlights
 +  * Engine removal
 +    * Inspect fuel tank for gasoline conversion
 +  * Drive shaft
 +    * Cut out shaft log
 +    * Fill and fair both ends
 +
 +====== Pending Estimate Request ======
 +
 +=== New Primary Winches ===
 +  * Winches will be provided, I found a pair on sale
 +  * Removal of current ones
 +    * keeping wood coaming mount platform
 +    * remove cleats, but I want to keep them
 +  * Installation of two "Lewmar No. 30 CST Ocean Series Self-Tailing"
 +    * would like them bolted through the deck
 +
 +=== Chain Plates ===
 +  * Chain plate removal
 +  * X-ray inspection for flaws, or just replace?
 +  * Will all chain plates need removing, or can a select few be used as a sample base?
 +  * I think headstay plate needs attention regardless
 +  * Would they benefit from having a stainless backing plate on the inside on top of the current wooden one?  Currently plate nuts have a backing washer pushing into a wood backing plate
 +  * If the chain plates look weak, I want to replace with silicon bronze from a local source if possible.
 +    * or there is always Allied Titanium if price affordibly
 +
 +=== Boom goose-neck ===
 +  * The bushing piece that connects the boom to the mast needs replacement
 +  * Distance needs to be maintained in order for mainsail to keep dimensions (the tack hank)
 +
 +=== Mast Rebuild ===
 +  * Cost the same for a new mast/boom instead of all this work?
 +  * bring 3 halyards internal, 1 stays external, new sheaves
 +  * new standing rigging hardware, toggles, hardware, bolts, etc.
 +    * assume Dynex Dux rope rigging is going to be used
 +  * spreader hardware inspection/replacement, new boots
 +  * Masthead
 +    * cut top off, install one with fasteners not welded
 +    * VHF antenna with cable run
 +    * Airmar weatherstation PB200 with cable run
 +  * LED lighting installed into masthead tri-color/anchor assembly
 +  * Aqua Marine steaming light installed, gutted with LED lighting
 +
 +====== Future ======
 +
 +=== Outboard ===
 +  * Lowering and reinforcing outboard bracket
 +  * Conversion of diesel fuel tank to gas
 +
 +=== Rudder/Tiller Rebuild ===
 +  * Teardown of rudder/tiller assembly
 +  * X-ray inspection of rudder for flaws (or whatever is equivalent for inspecting rudder issues)
 +  * Reassembly of rudder/tiller, removing any play from the tiller (new bushings, fasteners, etc)
 +
 +=== Standing Rigging ===
 +  * Work with Colligo Marine on a Dynex Dux system
 +    * oversize the headstay?  
 +  * Can old bronze turnbuckles be heat treated and re-used?
 +    * if not, new turnbuckles or go with deadeye terminators?
 +
 +=== Stern port/starboard internal chainplates ===
 +  * Strong fixed points for fastening a bridle for a series drogue
 +  * Should also be able to use for running backstays for future solent or inner stay.
 +
 +=== New toerail tracks ===
 +  * black, through-bolted, recommendations on what kind of track
mercator/todo.1380078166.txt.bz2 ยท Last modified: 2014/06/24 05:40 (external edit)