+ | ====== Deck ====== | ||
+ | * Strip paint | ||
+ | * Strip varnish from coach-roof | ||
+ | * Remove/ | ||
+ | * Fair and fillet deck, coach-roof | ||
+ | * Fillet deck to coach-roof joints, deck to coaming joints | ||
+ | * Look at owner supplied S-1 sealer. | ||
+ | * Epoxy fill hardware fastener holes | ||
+ | * Epoxy fill engine control locations (next to tiller), controls not to be re-installed | ||
+ | * Two layers of FRP, sand, fair | ||
+ | * Fillet coach-roof to deck joint and deck to toe-rail | ||
+ | * Paint deck (cream) | ||
+ | * Sand varnish, Paint over coach-roof teak (cream) | ||
+ | * Sand varnish, Paint toe-rail (black) | ||
+ | * Sand and re-varnish coaming around cockpit area | ||
+ | * Install new self-tailing winches | ||
+ | ====== Hardware Re-Install ====== | ||
+ | * All through-bolted hardware to be installed with fitted backing plates | ||
+ | * Stantion bases and stantions | ||
+ | * Hawse-pipe | ||
+ | * Pulpits | ||
+ | * Tiller arm, base and rudder | ||
+ | * Do not use 3M 5200 | ||
+ | |||
+ | ====== Bottom ====== | ||
+ | * Two coats of ablative bottom paint |