 +====== Deck ======
 +  * Strip paint
 +  * Strip varnish from coach-roof
 +  * Remove/chip-out rot, replace with closed cell foam
 +  * Fair and fillet deck, coach-roof
 +  * Fillet deck to coach-roof joints, deck to coaming joints
 +  * Look at owner supplied S-1 sealer.  Coat deck if recommended.
 +  * Epoxy fill hardware fastener holes
 +  * Epoxy fill engine control locations (next to tiller), controls not to be re-installed
 +  * Two layers of FRP, sand, fair
 +  * Fillet coach-roof to deck joint and deck to toe-rail
 +  * Paint deck (cream)
 +  * Sand varnish, Paint over coach-roof teak (cream)
 +  * Sand varnish, Paint toe-rail (black)
 +  * Sand and re-varnish coaming around cockpit area
 +  * Install new self-tailing winches
  
 +====== Hardware Re-Install ======
 +  * All through-bolted hardware to be installed with fitted backing plates
 +  * Stantion bases and stantions
 +  * Hawse-pipe
 +  * Pulpits
 +  * Tiller arm, base and rudder
 +  * Do not use 3M 5200
 +
 +====== Bottom ======
 +  * Two coats of ablative bottom paint