====== Deck ====== | |
* Strip paint | |
* Strip varnish from coach-roof | |
* Remove/ | |
* Fair and fillet deck, coach-roof | |
* Fillet deck to coach-roof joints, deck to coaming joints | |
* Look at owner supplied S-1 sealer. | |
* Epoxy fill hardware fastener holes | |
* Epoxy fill engine control locations (next to tiller), controls not to be re-installed | |
* Two layers of FRP, sand, fair | |
* Fillet coach-roof to deck joint and deck to toe-rail | |
* Paint deck (cream) | |
* Sand varnish, Paint over coach-roof teak (cream) | |
* Sand varnish, Paint toe-rail (black) | |
* Sand and re-varnish coaming around cockpit area | |
* Install new self-tailing winches | |
====== Hardware Re-Install ====== | |
* All through-bolted hardware to be installed with fitted backing plates | |
* Stantion bases and stantions | |
* Hawse-pipe | |
* Pulpits | |
* Tiller arm, base and rudder | |
* Do not use 3M 5200 | |
====== Bottom ====== | |
* Two coats of ablative bottom paint |