 ====== Deck ======
   * Strip paint
   * Strip varnish from coach-roof
   * Remove/chip-out rot, replace with closed cell foam
   * Fair and fillet deck, coach-roof
   * Fillet deck to coach-roof joints, deck to coaming joints
   * Look at owner supplied S-1 sealer.  Coat deck if recommended.
   * Epoxy fill hardware fastener holes
   * Epoxy fill engine control locations (next to tiller), controls not to be re-installed
   * Two layers of FRP, sand, fair
   * Fillet coach-roof to deck joint and deck to toe-rail
   * Paint deck (cream)
   * Sand varnish, Paint over coach-roof teak (cream)
   * Sand varnish, Paint toe-rail (black)
   * Sand and re-varnish coaming around cockpit area
   * Install new self-tailing winches
 
 ====== Hardware Re-Install ======
   * All through-bolted hardware to be installed with fitted backing plates
   * Stantion bases and stantions
   * Hawse-pipe
   * Pulpits
   * Tiller arm, base and rudder
   * Do not use 3M 5200
 
 ====== Bottom ======
   * Two coats of ablative bottom paint
mercator/boatyardwork.1337815091.txt.bz2 ยท Last modified: 2014/06/24 05:40 (external edit)