| ====== Deck ====== | |
| * Strip paint | |
| * Strip varnish from coach-roof | |
| * Remove/ | |
| * Fair and fillet deck, coach-roof | |
| * Fillet deck to coach-roof joints, deck to coaming joints | |
| * Look at owner supplied S-1 sealer. | |
| * Epoxy fill hardware fastener holes | |
| * Epoxy fill engine control locations (next to tiller), controls not to be re-installed | |
| * Two layers of FRP, sand, fair | |
| * Fillet coach-roof to deck joint and deck to toe-rail | |
| * Paint deck (cream) | |
| * Sand varnish, Paint over coach-roof teak (cream) | |
| * Sand varnish, Paint toe-rail (black) | |
| * Sand and re-varnish coaming around cockpit area | |
| * Install new self-tailing winches | |
| ====== Hardware Re-Install ====== | |
| * All through-bolted hardware to be installed with fitted backing plates | |
| * Stantion bases and stantions | |
| * Hawse-pipe | |
| * Pulpits | |
| * Tiller arm, base and rudder | |
| * Do not use 3M 5200 | |
| ====== Bottom ====== | |
| * Two coats of ablative bottom paint | |