Strip paint
Strip varnish from coach-roof
Remove/chip-out rot, replace with closed cell foam
Fair and fillet deck, coach-roof
Fillet deck to coach-roof joints, deck to coaming joints
Look at owner supplied S-1 sealer. Coat deck if recommended.
Epoxy fill hardware fastener holes
Epoxy fill engine control locations (next to tiller), controls not to be re-installed
Two layers of FRP, sand, fair
Fillet coach-roof to deck joint and deck to toe-rail
Paint deck (cream)
Sand varnish, Paint over coach-roof teak (cream)
Sand varnish, Paint toe-rail (black)
Sand and re-varnish coaming around cockpit area
Install new self-tailing winches