====== Deck ====== * Strip paint * Strip varnish from coach-roof * Remove/chip-out rot, replace with closed cell foam * Fair and fillet deck, coach-roof * Fillet deck to coach-roof joints, deck to coaming joints * Look at owner supplied S-1 sealer. Coat deck if recommended. * Epoxy fill hardware fastener holes * Epoxy fill engine control locations (next to tiller), controls not to be re-installed * Two layers of FRP, sand, fair * Fillet coach-roof to deck joint and deck to toe-rail * Paint deck (cream) * Sand varnish, Paint over coach-roof teak (cream) * Sand varnish, Paint toe-rail (black) * Sand and re-varnish coaming around cockpit area * Install new self-tailing winches ====== Hardware Re-Install ====== * All through-bolted hardware to be installed with fitted backing plates * Stantion bases and stantions * Hawse-pipe * Pulpits * Tiller arm, base and rudder * Do not use 3M 5200 ====== Bottom ====== * Two coats of ablative bottom paint